Location: Akkar, Lebanon.
Type: Substation.
Description: Wind energy project in Akkar region requiring a substation to connect to HV
network.
PDP Energy Scope: For the ongoing wind energy project in Lebanon, a
220KV substation will be constructed. PDP Energy is executing the conceptual
design and the detailed engineering of the substation (220KV/300MVA).
Client: Sustainable Akkar/LWP/Hawa Akkar.