ArchivesMiddle East

Total Terminal Oily Water Treatment

Project Details

NameYearLocationClientTypeDescriptionScope
Total Terminal Oily Water Treatment2019Dora, LebanonTotal LibanInfrastructureOily water system designTerminal oily water network and treatment system conceptual and detailed design

Project Background & Objectives

The Total Terminal Oily Water Treatment project was initiated to critically upgrade the environmental compliance and wastewater processing infrastructure at a major coastal fuel storage facility in Dora, Lebanon. Commissioned by Total Liban, this targeted midstream infrastructure development required specialized environmental and fluid engineering to safely manage industrial runoff from active fuel sectors. Within this vital downstream energy distribution framework, PDP Energy was selected to command the core technological modeling and realization phases. The primary company-specific objectives centered on executing a comprehensive Oily water system design, delivering the full terminal oily water network and treatment system conceptual and detailed design to guarantee absolute pollution control and strict regulatory adherence.

Project Challenges

Designing an efficient industrial wastewater network within a highly active, high-hazard petroleum storage terminal presents intense chemical, mechanical, and fluid dynamics complexities. Industrial runoff from fuel loading racks, tank farms, and containment dikes contains volatile hydrocarbons, suspended solids, and chemical contaminants that require sophisticated extraction techniques before environmental discharge. PDP Energy had to navigate complex technical constraints, engineering a robust drainage network capable of collecting irregular stormwater surges and process wastewater without risking cross-contamination or structural backflows. Furthermore, sizing the centralized separation equipment and oil-water separators demanded highly precise hydraulic calculations and fluid velocity mapping to maximize separation efficiency under varying flow rates, all while operating seamlessly alongside continuous terminal logistics.

Project Outcomes

Operating as the primary detailed engineering and environmental design partner, PDP Energy successfully formulated and delivered the complete conceptual and multi-disciplinary detailed design packages for the oily water infrastructure. The project effectively established a highly resilient, modern technical reference for downstream oil and gas environmental safety in the Levant region. By providing synchronized civil-mechanical piping layouts, advanced hydraulic flow schematics, and optimized treatment system blueprints, PDP Energy cleared the path for the secure deployment of the updated network, drastically upgrading the terminal’s environmental defense layer, eliminating accidental discharge risks, and ensuring complete compliance with stringent environmental preservation laws.

Industrial Energy Audits

Project Details

NameYearLocationClientTypeDescriptionScope
Industrial Energy Audits2024Across LebanonDAIEnergy AuditEnergy industrial auditsPDP Energy is executing Level 2 energy audits for 33 industries in several regions of Lebanon

Project Background & Objectives

The Industrial Energy Audits project was initiated as a massive, nation-wide efficiency program to optimize resource consumption and reduce operating overhead across Lebanon’s manufacturing sector. Commissioned by DAI, this extensive utility consulting initiative targeted the severe power grid deficits and high fuel costs burdening local production facilities. Within this critical economic and sustainability framework, PDP Energy was selected to command the highly technical evaluation phase. The primary company-specific objectives centered on executing comprehensive energy industrial audits, where the engineering team is actively executing Level 2 energy audits for 33 industries in several regions of Lebanon to uncover critical conservation opportunities.

Project Challenges

Orchestrating intensive Level 2 energy audits simultaneously across 33 distinct manufacturing facilities introduces extraordinary logistical and technical complexities. Each industrial site—ranging from heavy fabrication and chemical processing to food production—features highly unique, specialized machinery networks with disparate thermodynamic and electrical baselines. PDP Energy had to navigate the immense challenge of gathering highly precise, real-time consumption profiles from intricate boiler systems, compressed air loops, and heavy motor drives without causing any production downtime. This demanded meticulous multi-regional site scheduling, deploying an array of sophisticated data-logging equipment, and cross-referencing volatile backup generator fuel logs to safely isolate deep structural and operational energy wastes.

Project Outcomes

Operating as the primary industrial energy consulting partner, PDP Energy is successfully delivering individual, data-driven optimization master plans for each of the facility profiles. The project effectively establishes an unprecedented technical benchmark for large-scale corporate efficiency and carbon mapping across Lebanon. By providing highly detailed thermodynamic models and prioritized energy conservation measures, PDP Energy is clearing the path for 33 major industries to systematically lower their utility overhead, improve machinery runtime reliability, and pivot toward highly sustainable, lean manufacturing frameworks.

International College, Energy Audit

Project Details

NameYearLocationClientTypeDescriptionScope
International College, Energy Audit2022Beirut, LebanonArina EnergyEnergy AuditEnergy audit for all school buildingsPDP Energy executed a level II energy audit for all school buildings

Project Background & Objectives

The International College, Energy Audit project was initiated to deploy advanced sustainability and utility optimization diagnostics for a premier educational institution in Beirut, Lebanon. Commissioned by Arina Energy, this targeted institutional assessment focused on restructuring power utilization patterns to reduce carbon exposure and heavy reliance on costly regional power supplies. Within this critical facility management framework, PDP Energy was selected to direct the comprehensive technical evaluation. The primary company-specific objectives centered on executing a complete Energy audit for all school buildings, where the engineering team successfully executed a level II energy audit for all school buildings to map consumption behaviors and identify deep structural energy inefficiencies.

Project Challenges

Conducting an intensive Level II energy audit across a highly active, multi-building urban educational campus introduces complex operational and data-modeling hurdles. Tracking dynamic real-time electrical profiles across diverse zones—ranging from climate-controlled auditorium spaces and high-density computing laboratories to general classroom facilities—demands precise technical coordination. PDP Energy had to navigate the challenge of gathering massive, highly precise consumption datasets without disrupting the school’s daily academic calendar or compromising student comfort. This required deploying sophisticated, non-intrusive logging devices, cross-referencing intricate HVAC system cooling loads, and modeling building thermal envelopes to isolate energy waste accurately.

Project Outcomes

Operating as the primary energy consulting partner, PDP Energy successfully formulated and delivered a complete Level II campus energy audit package. The project effectively established a highly accurate data foundation to transition the institution toward automated, automated and lean energy management. By delivering prioritized energy conservation measures and synchronized utility optimization strategies, PDP Energy’s engineering roadmap paved the way for implementing optimized power configurations that lower institutional operational costs, improve equipment runtime reliability, and foster a highly eco-friendly environment for thousands of students and faculty members.

Bankers Insurance, Energy Audit

Project Details

NameYearLocationClientTypeDescriptionScope
Bankers Insurance, Energy Audit2021Beirut, LebanonBankers Assurance SALEnergy AuditEnergy audit for office buildingsPDP Energy realized an audit for the main office and generation supply to optimize the mix usage and audit office consumption

Project Background & Objectives

The Bankers Insurance, Energy Audit project was initiated as a primary corporate sustainability and operational efficiency drive to reduce carbon exposure and optimize utility costs for high-density corporate real estate. Commissioned by Bankers Assurance SAL, the assessment aimed to overhaul power utilization across the client’s corporate infrastructure. Within this commercial optimization framework, PDP Energy was selected to spearhead the comprehensive technical diagnostics. The primary company-specific objectives centered on executing a detailed energy audit for the main office buildings, which involved deep consumption monitoring and assessing the active generation supply systems to optimize the facility’s power mix usage.

Project Challenges

Conducting an intensive energy audit within fully operational corporate headquarters introduces distinct technical and analytical challenges. Tracking dynamic electrical loads across complex office infrastructure—such as high-demand server rooms, central HVAC systems, and continuous office equipment grids—requires highly detailed measurements. PDP Energy had to overcome the challenge of gathering and modeling precise real-time consumption data without causing any operational downtime or disrupting the company’s daily financial activities. This demanded meticulous load-profiling and subtle equipment logging to evaluate the building’s thermal properties and isolate system inefficiencies safely and accurately.

Project Outcomes

Operating as the primary energy consulting partner, PDP Energy successfully delivered a complete facility energy audit and optimization blueprint. The project effectively established a highly accurate data foundation to transition the office complex toward automated and lean energy management. By delivering a prioritized list of actionable conservation measures and synchronized power-mix strategies, PDP Energy’s engineering roadmap paved the way for significant utility cost savings, optimized backup generator usage, and a reduced carbon footprint across the corporate headquarters.

Health Care Centers, Energy Audit

Project Details

NameYearLocationClientTypeDescriptionScope
Health Care Centers, Energy Audit2022Akkar, LebanonUNDPEnergy AuditEnergy Audit and PV implementation assessmentPDP Energy is executing the energy audit for four health care centers in Palestinian gathering to study alternative sustainable energy viability

Project Background & Objectives

The Health Care Centers, Energy Audit project was initiated to deploy critical sustainability diagnostics and establish clean energy frameworks for essential community medical infrastructure in Akkar, Lebanon. Sponsored and driven by the United Nations Development Programme (UNDP), this targeted social-impact initiative focused on addressing severe power constraints facing localized healthcare operations. Within this vital medical support context, PDP Energy was selected to spearhead the specialized technical investigation. The primary company-specific objectives centered on executing a comprehensive Energy Audit and PV implementation assessment, specifically auditing the consumption patterns for four health care centers in Palestinian gatherings to study alternative sustainable energy viability and ensure long-term energy security.

Project Challenges

Conducting detailed energy audits and renewable integration modeling across multiple active clinical facilities introduces severe logistical, environmental, and operational complexities. Healthcare environments require absolute power continuity; tracking and diagnosing real-time electrical fluctuations across sensitive diagnostics networks, cold-chain vaccine refrigeration, and emergency lighting systems demands strict technical care. PDP Energy had to balance these constraints across four distinct geographical footprints without causing any operational disruptions or compromising patient care. This required deploying specialized, non-intrusive logging equipment, cross-referencing highly irregular municipal power supplies, and modeling roof-mount structural solar constraints on aging institutional buildings.

Project Outcomes

Operating as the primary energy consulting partner, PDP Energy successfully formulated and delivered the complete energy audit and sustainable feasibility blueprints for all four medical facilities. The project effectively established a practical, highly localized data foundation to transition critical community healthcare infrastructure toward resilient, self-sustaining microgrids. By providing prioritized energy conservation measures and precise photovoltaic integration designs, PDP Energy cleared the path for future solar implementation that will dramatically lower clinic utility costs, safeguard vital medical refrigeration, and guarantee uninterrupted healthcare services for thousands of residents.

Nasco Insurance Group, Energy Audit

Project Details

NameYearLocationClientTypeDescriptionScope
Nasco Insurance Group, Energy Audit2022Beirut, LebanonNasco Insurance GroupEnergy AuditEnergy audit for two office buildingsPDP Energy executed an audit for the two headquarter buildings covering electrical loads, generator optimization, and a solar PV installation feasibility study

Project Background & Objectives

The Nasco Insurance Group, Energy Audit project was initiated as a primary corporate sustainability and utility cost-reduction drive to optimize power utilization across high-density corporate real estate in Beirut, Lebanon. Commissioned directly by the Nasco Insurance Group, the commercial optimization assessment aimed to systematically overhaul energy consumption patterns across the company’s regional facilities. Within this critical facility management framework, PDP Energy was selected to spearhead the comprehensive technical diagnostics. The primary company-specific objectives centered on executing a detailed energy audit for two office buildings, where the engineering team successfully executed an audit for the two headquarter buildings covering electrical loads, generator optimization, and a solar PV installation feasibility study to isolate deep structural wastes and outline a transition toward green energy.

Project Challenges

Conducting an intensive energy audit across two active, high-density corporate headquarters introduces distinct technical, analytical, and operational hurdles. Tracking dynamic electrical loads across complex office infrastructure—ranging from high-demand server rooms and IT mainframes to central HVAC cooling systems—demands meticulous logging precision. PDP Energy had to navigate the challenge of gathering massive real-time consumption datasets and structural building property profiles without causing any network downtime or disrupting daily insurance operations. This required mapping highly unstable municipal utility inputs, evaluating localized backup diesel generator efficiencies, and modeling complex solar shading constraints on the urban rooftop surfaces to accurately assess alternative energy viability.

Project Outcomes

Operating as the primary energy consulting partner, PDP Energy successfully formulated and delivered a complete multi-building energy audit and sustainable feasibility blueprint. The project effectively established a highly accurate, data-driven foundation to transition the corporate headquarters toward automated, lean energy management and localized renewable generation. By delivering a prioritized list of actionable conservation measures, optimized generator staging models, and a verified rooftop solar roadmap, PDP Energy’s engineering framework paved the way for significant utility cost reductions, maximum fuel savings, and a diminished carbon footprint across the corporate campus.

Tripoli Saray 104 KWp PV Plant

Project Details

NameYearLocationClientTypeDescriptionScope
Tripoli Saray 104 KWp PV Plant2021Tripoli, LebanonSiren AssociatesPhotovoltaicLoad study and conceptual design for a roof PV plantPDP Energy realized a load study and the conceptual design of a 104 kWp PV plant for the newly constructed Control & Commend Center. System includes a battery storage system

Project Background & Objectives

The Tripoli Saray 104 KWp PV Plant project was initiated to deploy a resilient, highly dependable renewable power architecture for critical public security infrastructure in Tripoli, Lebanon. Commissioned by Siren Associates, this highly specialized green initiative focused on providing dedicated energetic backup autonomy for a newly constructed, mission-critical Control & Command Center. Within this high-security civic framework, PDP Energy was selected to orchestrate the vital early engineering and load-balancing phases of the asset. The primary company-specific objectives centered on conducting a comprehensive Load study and conceptual design for a roof PV plant, where the engineering team successfully structured a modern 104 kWp PV plant integrated with a high-performance battery storage system to guarantee uncompromised, continuous security monitoring.

Project Challenges

Powering a specialized regional law enforcement control and command hub introduces intense electrical engineering constraints and uncompromising operational standards. Because an active security operations facility demands absolute data integrity and round-the-clock functionality, the microgrid infrastructure must seamlessly manage fluctuating real-time solar irradiance without causing any localized power drops or grid transition delays. PDP Energy had to navigate complex technical hurdles, including precisely mapping irregular municipal and backup utility inputs, evaluating structural roof layouts on public institutional real estate, and sizing high-performance battery banks capable of enduring deep discharge cycles. This demanding evaluation required advanced electrical modeling and precise load-profiling to isolate critical security mainframes, preventing communication downtime or hardware vulnerabilities under emergency blackout conditions.

Project Outcomes

Operating as the primary conceptual engineering partner, PDP Energy successfully formulated and delivered the complete load study and conceptual microgrid design package for the security asset. The project effectively established an advanced, climate-resilient technical blueprint for critical public safety and civic utility infrastructure in Northern Lebanon. By providing highly precise load-matching models, specialized inverter staging parameters, and synchronized electrical network layouts, PDP Energy paved the way for the secure installation of the 104 kWp solar asset, ensuring the command center gains absolute power redundancy, lowers institutional fossil-fuel overhead, and maintains continuous, self-sufficient monitoring operations.

Hadchit 152 KWp Water Well PV Pumping

Project Details

NameYearLocationClientTypeDescriptionScope
Hadchit 152 KWp Water Well PV Pumping2024Hadchit, LebanonUNDPPhotovoltaicSite supervision of a water well PV system constructionPDP Energy supervised the execution of the 152 kWp system to provide solar energy for pumping purpose

Project Background & Objectives

The Hadchit 152 KWp Water Well PV Pumping project was initiated to deploy a reliable, sustainable utility infrastructure solution aimed at securing continuous clean water access for the municipal area of Hadchit, Lebanon. Sponsored and driven by the United Nations Development Programme (UNDP), this vital community-focused initiative targeted the transition of heavy water extraction machinery away from unreliable national grids and costly diesel generation. Within this developmental context, PDP Energy was selected to command the critical quality assurance and execution phase of the asset. The primary company-specific objectives centered on executing the thorough site supervision of a water well PV system construction, where the team strictly supervised the execution of the 152 kWp system to provide solar energy for pumping purpose.

Project Challenges

Translating specialized solar engineering plans into field construction within rugged municipal terrains presents substantial operational and physical challenges. Managing site execution for a high-capacity 152 kWp array requires meticulous quality control across structural anchoring foundations, high-voltage DC cabling, and centralized inverter stations. PDP Energy had to navigate significant supervisory hurdles, including verifying proper component alignment on complex local topographies, ensuring robust grounding protections against voltage spikes, and coordinating heavy installation schedules without causing critical shutdowns to the village’s active water distribution network.

Project Outcomes

Operating as the primary technical supervisor on-site, PDP Energy successfully concluded its comprehensive field oversight and construction monitoring services for the photovoltaic installation. The project effectively guaranteed that all components of the 152 kWp pumping infrastructure were executed with maximum safety, long-term durability, and strict technical precision. By providing rigorous independent engineering supervision, PDP Energy helped secure a high-performing renewable asset that dramatically minimizes municipal fuel costs, lowers local carbon emissions, and ensures a dependable, eco-friendly water supply for thousands of residents across Hadchit.

Barja 178 KWp Water Well PV Pumping

Project Details

NameYearLocationClientTypeDescriptionScope
Barja 178 KWp Water Well PV Pumping2023Barja, LebanonUNDPPhotovoltaicSite supervision of a water well PV system constructionPDP Energy supervised the execution of the 178 kWp system to provide solar energy for pumping purpose

Project Background & Objectives

The Barja 178 KWp Water Well PV Pumping project was initiated to deploy a high-capacity, climate-resilient utility solution aimed at stabilizing local municipal water supplies in Barja, Lebanon. Sponsored and driven by the United Nations Development Programme (UNDP), this vital infrastructure initiative focused on shifting heavy electrical demand away from failing localized grids and expensive diesel generation. Within this developmental context, PDP Energy was selected to lead the critical quality assurance phase of the asset. The primary company-specific objectives centered on executing the thorough site supervision of a water well PV system construction, strictly overseeing the installation of the 178 kWp system to ensure the physical deployment perfectly aligned with international standards and successfully delivered clean solar energy for pumping purposes.

Project Challenges

Translating complex solar engineering blueprints into field construction for municipal pumping infrastructure presents substantial operational and physical challenges. Managing site execution for a large 178 kWp array requires meticulous quality control across structural foundations, high-voltage DC cabling, and specialized inverter stations. PDP Energy had to overcome significant supervisory hurdles, including verifying proper component alignment on complex local terrain, ensuring robust grounding protections against voltage spikes, and coordinating heavy installation schedules without causing critical shutdowns to the village’s active water distribution network.

Project Outcomes

Operating as the primary technical supervisor on-site, PDP Energy successfully delivered full site supervision and construction monitoring services for the photovoltaic installation. The project effectively guaranteed that all components of the 178 kWp pumping infrastructure were executed with maximum safety, durability, and technical precision. By providing rigorous field oversight, PDP Energy helped secure a high-performing renewable asset that dramatically cuts municipal fuel costs, lowers local carbon emissions, and ensures a dependable, eco-friendly water supply for thousands of residents in the region.

Project Gallery

Dar Al Aytam – Chemlan 36 KWp PV Plant

Project Details

NameYearLocationClientTypeDescriptionScope
Dar Al Aytam - Chemlan 36 KWp PV Plant2024Chemlan, LebanonDar Al AytamPhotovoltaicClient Representative role for facility solar implementationPDP Energy oversaw the installation of the 36 kWp system

Project Background & Objectives

The Dar Al Aytam – Chemlan 36 KWp PV Plant project was initiated to deploy a reliable, sustainable power infrastructure solution for a vital social welfare institution in Chemlan, Lebanon. Commissioned by Dar Al Aytam, this commercial-scale project aimed to buffer the facility’s extensive operational footprint against the steep financial burdens of diesel fuel generation and severe national grid deficits. Within this critical community support context, PDP Energy was selected to protect the client’s interests throughout the asset deployment. The primary company-specific objectives centered on fulfilling the Client Representative role for facility solar implementation, where the engineering team directly oversaw the installation of the 36 kWp system to ensure strict alignment with safety, quality, and technical performance benchmarks.

Project Challenges

Acting as a client representative for an active social institution requires managing rigorous engineering standards without causing disruptions to daily care operations. PDP Energy had to navigate substantial quality-control hurdles, such as auditing third-party contractor schematics, validating component certifications, and monitoring structural roof-mounting integrity on existing institutional buildings. Ensuring that the installation process maintained maximum electrical safety, robust weatherproofing, and safe grid-interconnection capabilities required meticulous physical site inspections and constant technical verification to isolate installation errors before they became long-term operational liabilities.

Project Outcomes

Operating as the dedicated client representative, PDP Energy successfully concluded its comprehensive technical oversight and installation auditing services for the solar asset. The project effectively guaranteed that the 36 kWp photovoltaic system was executed to the highest engineering standards, ensuring long-term durability and structural safety. By delivering rigorous independent engineering supervision, PDP Energy paved the way for a high-performing renewable asset that dramatically lowers the institution’s monthly energy expenses, redirects vital financial resources back to child welfare, and secures a clean, uninterrupted power supply for the campus.

Project Gallery