Project Details

NameYearLocationClientTypeDescriptionScope
Dar Al Aytam - Chemlan 36 KWp PV Plant2024Chemlan, LebanonDar Al AytamPhotovoltaicClient Representative role for facility solar implementationPDP Energy oversaw the installation of the 36 kWp system

Project Background & Objectives

The Dar Al Aytam – Chemlan 36 KWp PV Plant project was initiated to deploy a reliable, sustainable power infrastructure solution for a vital social welfare institution in Chemlan, Lebanon. Commissioned by Dar Al Aytam, this commercial-scale project aimed to buffer the facility’s extensive operational footprint against the steep financial burdens of diesel fuel generation and severe national grid deficits. Within this critical community support context, PDP Energy was selected to protect the client’s interests throughout the asset deployment. The primary company-specific objectives centered on fulfilling the Client Representative role for facility solar implementation, where the engineering team directly oversaw the installation of the 36 kWp system to ensure strict alignment with safety, quality, and technical performance benchmarks.

Project Challenges

Acting as a client representative for an active social institution requires managing rigorous engineering standards without causing disruptions to daily care operations. PDP Energy had to navigate substantial quality-control hurdles, such as auditing third-party contractor schematics, validating component certifications, and monitoring structural roof-mounting integrity on existing institutional buildings. Ensuring that the installation process maintained maximum electrical safety, robust weatherproofing, and safe grid-interconnection capabilities required meticulous physical site inspections and constant technical verification to isolate installation errors before they became long-term operational liabilities.

Project Outcomes

Operating as the dedicated client representative, PDP Energy successfully concluded its comprehensive technical oversight and installation auditing services for the solar asset. The project effectively guaranteed that the 36 kWp photovoltaic system was executed to the highest engineering standards, ensuring long-term durability and structural safety. By delivering rigorous independent engineering supervision, PDP Energy paved the way for a high-performing renewable asset that dramatically lowers the institution’s monthly energy expenses, redirects vital financial resources back to child welfare, and secures a clean, uninterrupted power supply for the campus.