Project Details
| Name | Year | Location | Client | Type | Description | Scope |
|---|---|---|---|---|---|---|
| Rachid Karame 5 MWp PV Plant | 2017 | Tripoli, Lebanon | Phoenix energy | Photovoltaic | First utility-grid connected 5 MWp solar PV plant impact study in Lebanon | Executed connection and grid impact assessment study |
Project Background & Objectives
The Rachid Karame 5 MWp PV Plant project was initiated as a historic, utility-scale renewable energy milestone to advance the integration of clean power into the northern regional network of Tripoli, Lebanon. Commissioned by Phoenix energy, this pioneering infrastructure asset represented the first utility-grid connected 5 MWp solar PV plant impact study in Lebanon. Within this highly significant regulatory and structural engineering framework, PDP Energy was appointed to command the critical analytical modeling phase. The primary company-specific objectives centered on evaluating network compatibility and safety, where the engineering team successfully executed the connection and grid impact assessment study required to bridge the massive solar plant safely with the national utility grid.
Project Challenges
Project Outcomes
Operating as the specialized network consulting partner, PDP Energy successfully formulated and delivered the definitive connection and grid impact assessment study. The project effectively established an unprecedented technical blueprint and regulatory benchmark for utility-scale solar integration across Lebanon. By providing highly precise power evacuation models, localized protection schemes, and verified grid-interconnection parameters, PDP Energy cleared the path for the secure deployment of the 5 MWp renewable asset, giving state utility operators total operational confidence and accelerating the nation’s transition toward sustainable utility-grade power.