The Glass Factory 6 MW HFO Power Plant project was initiated to build a dedicated, highly stable captive power generation facility to support intense industrial manufacturing operations in Chtoura, Lebanon. Commissioned by Glasspack, this high-reliability project focused on establishing an independent HFO power plant based on four Hyundai engines capable of delivering continuous, 24/24 power to a glass factory. Within this critical heavy industrial operational framework, PDP Energy was selected to direct the crucial early phase of the facility. The primary company-specific objectives centered on the execution of the preliminary and conceptual design, setting up the core electrical and thermal baseline architecture to protect manufacturing lines against grid instability.