Project Details

NameYearLocationClientTypeDescriptionScope
Barja 178 KWp Water Well PV Pumping2023Barja, LebanonUNDPPhotovoltaicSite supervision of a water well PV system constructionPDP Energy supervised the execution of the 178 kWp system to provide solar energy for pumping purpose

Project Background & Objectives

The Barja 178 KWp Water Well PV Pumping project was initiated to deploy a high-capacity, climate-resilient utility solution aimed at stabilizing local municipal water supplies in Barja, Lebanon. Sponsored and driven by the United Nations Development Programme (UNDP), this vital infrastructure initiative focused on shifting heavy electrical demand away from failing localized grids and expensive diesel generation. Within this developmental context, PDP Energy was selected to lead the critical quality assurance phase of the asset. The primary company-specific objectives centered on executing the thorough site supervision of a water well PV system construction, strictly overseeing the installation of the 178 kWp system to ensure the physical deployment perfectly aligned with international standards and successfully delivered clean solar energy for pumping purposes.

Project Challenges

Translating complex solar engineering blueprints into field construction for municipal pumping infrastructure presents substantial operational and physical challenges. Managing site execution for a large 178 kWp array requires meticulous quality control across structural foundations, high-voltage DC cabling, and specialized inverter stations. PDP Energy had to overcome significant supervisory hurdles, including verifying proper component alignment on complex local terrain, ensuring robust grounding protections against voltage spikes, and coordinating heavy installation schedules without causing critical shutdowns to the village’s active water distribution network.

Project Outcomes

Operating as the primary technical supervisor on-site, PDP Energy successfully delivered full site supervision and construction monitoring services for the photovoltaic installation. The project effectively guaranteed that all components of the 178 kWp pumping infrastructure were executed with maximum safety, durability, and technical precision. By providing rigorous field oversight, PDP Energy helped secure a high-performing renewable asset that dramatically cuts municipal fuel costs, lowers local carbon emissions, and ensures a dependable, eco-friendly water supply for thousands of residents in the region.